How To Order

ORDERING PROCEDURE

1.) Customer should fax drawing to Sistone for quotation. Drawing should include measurements, edge detail, material name, sink type (undermount / topmount) or any        other cutouts.

2.) Sistone will fax “Proposal” and “Terms & Conditions” to Customer for approval.

3.) Customer should fax back approval to Sistone. A deposit for Labor and Material is Required to start the job.

4.) Customer should inform Sistone if cabinets are ready to be measured (cabinets should be installed & leveled, and existing top should be removed, and undermount          sinks should be at the jobsite). Sistone will schedule template day and install day upon receipt of deposit and approved proposal, and inform Customer of schedule.

5.) As soon as templates are made, it usually takes 7 to 10 working days to fabricate & install countertops. Customer needs to sign completion sheet on install day.

6.) Balance is due upon completion and should be handed to the lead installer on install day.